WHY DO WE CALL IT MAGIC?

With the vibrating Magic Screed, concrete levelers can cover an area 4x larger than with the traditional method – with less workers and less effort!

CONVENTIONAL METHOD

10 h.

For 5,000 ft²

(465 m²)

MAGIC SCREED METHOD

7 h.

For 20,000 ft²

(1858 m²)

1. CONCRETE PLACEMENT

Use rakes to spread the concrete as evenly as possible

over the work area. Avoid leaving excessive buildup or voids.

STEPS: CONCRETE PLACEMENT

2. LEVELING POINTS

Mark 4 leveling points, spaced according to the blade length. These points will define the slab’s elevation.

STEPS: LEVELING POINTS

3. MARKING

Use the Magic Screed to level the area between the leveling points (X) on both sides of the central, unleveled section.

STEPS: MARKING

4. LEVELING

With the help of 1 or 2 rakers, who add or remove concrete as needed, screed the prepared section of concrete. Repeat for each sections.

STEPS: LEVELING

1. CONCRETE PLACEMENT

Use rakes to spread the concrete as evenly as possible over the work area. Avoid leaving excessive buildup or voids.

2. LEVELING POINTS

Mark 4 leveling points, spaced according to the blade length. These points will define the slab’s elevation.

3. MARKING

Use the Magic Screed to level the area between the leveling points (X) on both sides of the central, unleveled section.

4. LEVELING

With the help of 1 or 2 rakers, who add or remove concrete as needed, screed the prepared section of concrete. Repeat for each sections.