1. CONCRETE PLACEMENT
Use rakes to spread the concrete as evenly as possible
over the work area. Avoid leaving excessive buildup or voids.

2. LEVELING POINTS
Mark 4 leveling points, spaced according to the blade length. These points will define the slab’s elevation.

3. MARKING
Use the Magic Screed to level the area between the leveling points (X) on both sides of the central, unleveled section.

4. LEVELING
With the help of 1 or 2 rakers, who add or remove concrete as needed, screed the prepared section of concrete. Repeat for each sections.

1. CONCRETE PLACEMENT
Use rakes to spread the concrete as evenly as possible over the work area. Avoid leaving excessive buildup or voids.

2. LEVELING POINTS
Mark 4 leveling points, spaced according to the blade length. These points will define the slab’s elevation.

3. MARKING
Use the Magic Screed to level the area between the leveling points (X) on both sides of the central, unleveled section.

4. LEVELING
With the help of 1 or 2 rakers, who add or remove concrete as needed, screed the prepared section of concrete. Repeat for each sections.